The scope of this project included the design, fabrication and delivery to site of an elevated walking platform to be installed in the Glory Arch at the Yarrangobilly Caves Precinct, Kosciuszko National Park. The remote access of the job location meant the bulk of materials were helicoptered in and the guys braved cold weather to complete on time.